DENGUARD INSTALLATION RESULTS REPORT

Image
Comparison of the average use results of the first three months before installation and three months after installation were reduced by 13.6%  Installation site: A manufacturing plant Installation date : 18 Apr 2017 Annual electric charge: 203,323,500 won(2016) Installation cost: 22,770,000 won(23Sheets)

DENGUARD IN KOREA

Image
South Korea a printing factory after installing DENGUARD the same period of power consumption compared to reduce 21 %. When the company's achievement is up and the machine runs more, the power consumption can still keep down.The power saving effect is certified Now facing the national recruiting agent Installation site : Daelim Industrial(A printing shop) Installation date : 13 Feb 2017 Annual electric charge: 42,964,390 won(2016) Installation cost: 5,940,000 won(6 Sheets)

DENGUARD is installed in a factory, 中山松德新材料装备 in China.

Image
DENGUARD is installed in a factory, 中山松德新材料装备 in China. Engineers from Japan and Korea, worked together for a test. In this case, we have successfully saved averagely 14% of electricity usage. We hope the number of saving percentage will go down further more as long as time goes by. Thanks, Mr. DOI and Mr. CHO.

DENGUARD in a factory, 深圳市力可兴电池厂 in China.

Image