DENGUARD INSTALLATION RESULTS REPORT
Comparison of the average use results of the first three months before installation and three months after installation were reduced by 13.6%
Installation site: A manufacturing plant
Installation date : 18 Apr 2017
Annual electric charge: 203,323,500 won(2016)
Installation cost: 22,770,000 won(23Sheets)
Installation site: A manufacturing plant
Installation date : 18 Apr 2017
Annual electric charge: 203,323,500 won(2016)
Installation cost: 22,770,000 won(23Sheets)
Comments
Post a Comment