We installed DENGUARD in A Automotive electrical wiring factory. The result of the average power consumption comparison between the first 4 months before installation and 2 months after installation shows a decrease of 10.9%
Popular posts from this blog
DENGUARD INSTALLATION RESULTS REPORT
Comparison of the average use results of the first three months before installation and three months after installation were reduced by 13.6% Installation site: A manufacturing plant Installation date : 18 Apr 2017 Annual electric charge: 203,323,500 won(2016) Installation cost: 22,770,000 won(23Sheets)